Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Ribs

Posted on April 19, 2008August 3, 2008 by Glenn

Form other RR#8, RR#9.

0.98 hours.

Posted in Wing

Post navigation

Previous: Nose Ribs, Rear Ribs
Next: Rear Ribs

Related Posts

  • Wing

Spar Caps

  • Glenn
  • June 6, 2009
  • 0

Spar cap fitting and pre-drilling. 4.83 hours.

  • Wing

Wing September 2009

  • Glenn
  • September 27, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 12/09/2009 Make timber brackets for spar assembly 15:00 18:00 3:00 3.00 13/09/2009 Drill out spar pilot […]

  • Wing

6-W-7 3 Hinge Doubler

  • Glenn
  • November 9, 2008
  • 0

6-W-7 3 Hinge Doubler. .85 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.