Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides.
5.27 hours.

Rear Rib Forming

Posted in Wing

Post navigation

Previous: Rear Ribs
Next: Nose Ribs

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 2, 2008
  • 0

Continued cutting 40 thou sheet including main spar webs. These took about 25 runs with an Olfa P-800 knife and were a bit tricky to […]

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Wing

Wing Spars March 2010

  • Glenn
  • March 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/03/2010 Continue with spars- after doing somemore setting up, I took some photos and emailed them […]