Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spars, fuel tank skins.

Posted on April 25, 2009September 23, 2009 by Glenn

Re-check Spar Web markings, de-burr edges prior to drilling. Cut Fuel Tank Skins to size.

4.33 Hours.

Posted in Wing

Post navigation

Previous: Bottom Spar Cap Angles
Next: Spar Webs

Related Posts

  • Wing

Centre Spar Doublers & Caps

  • Glenn
  • May 16, 2009
  • 0

Spot drill, then pilot drill Centre Spar Doublers & Caps. 4.22 Hours.

  • Wing

Doublers, Centre Spar Caps

  • Glenn
  • May 9, 2009
  • 0

Mark and cut Spar Cap Doublers and Centre Spar Caps. 1.18 Hours.

  • Wing

Aileron Bellcranks

  • Glenn
  • June 21, 2009
  • 0

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.