Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose ribs

Posted on May 3, 2008August 3, 2008 by Glenn

Finish forming last two nose ribs, cut lightening holes.

4.97 hours.

Nose Ribs

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Rudder Skin

Related Posts

  • Wing

Spar Cap Angles

  • Glenn
  • April 13, 2009
  • 0

Continue cutting and bending. 3.75 Hours.

  • Wing

Flap Ribs

  • Glenn
  • June 14, 2008
  • 0

Cut out blanks and began bending flap ribs. 2.83 Hours.

  • Wing

Rear rib lightening holes

  • Glenn
  • February 4, 2008
  • 0

Began cutting lightening holes in rear ribs with fly-cutter. 0.88 Hours

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.