Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 27, 2008August 3, 2008 by Glenn

Continue forming nose ribs. Also spent some time adding stiffening gusset to brake.

5.07 hours.

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose ribs

Related Posts

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 28, 2007
  • 0

Continue filing crimp cutouts in form blocks. 6.67 hours.

  • Wing

Aileron Skins

  • Glenn
  • June 9, 2008
  • 0

Scoured the skins in preparation for priming. I wanted to do this before bending, as it I knew it would be a lot easier than […]

  • Wing

Wing Spars

  • Glenn
  • August 31, 2008
  • 0

Set out wing spar webs. Also spent some time divising methods of forming Hat Stiffeners. 6.17 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.