Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 27, 2008August 3, 2008 by Glenn

Continue forming nose ribs. Also spent some time adding stiffening gusset to brake.

5.07 hours.

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose ribs

Related Posts

  • Wing

Aileron Bellcranks

  • Glenn
  • June 21, 2009
  • 0

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.

  • Wing

Wing Ribs

  • Glenn
  • May 29, 2009
  • 0

Continue flanging ribs with the car and jack… photos coming. 2.05 Hours.

  • Wing

Rear Channels

  • Glenn
  • April 10, 2009
  • 0

Continued shaping and truing channels. 3.17 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.