Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 27, 2008August 3, 2008 by Glenn

Continue forming nose ribs. Also spent some time adding stiffening gusset to brake.

5.07 hours.

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose ribs

Related Posts

  • Wing

Wing September 2009

  • Glenn
  • September 27, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 12/09/2009 Make timber brackets for spar assembly 15:00 18:00 3:00 3.00 13/09/2009 Drill out spar pilot […]

  • Wing

Ailerons

  • Glenn
  • March 7, 2009
  • 0

Complete drilling ailerons, cleco. Ready for hinge fitting. 2.08 Hours.

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

Make first rear rib, work on joggle method. 1.7 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.