Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Cap Angles

Posted on April 13, 2009September 23, 2009 by Glenn

Continue cutting and bending.

3.75 Hours.

Posted in Wing

Post navigation

Previous: Spar Cap Angles
Next: Spar Cap Angles

Related Posts

  • Wing

Nose Ribs

  • Glenn
  • April 26, 2008
  • 0

Continue forming Nose Ribs 6-W-5 2. 2.12 hours.

  • Wing

Wing August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/08/2009 Flaps 14:00 16:17 2:17 2.28 16:45 17:50 1:05 1.08 29/08/2009 Flap skin 11:00 13:05 2:05 […]

  • Wing

Spar Cap Angles

  • Glenn
  • April 12, 2009
  • 0

Drag out new sheet of 0.032, begin cutting for Spar Cap Angles. 3.67 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.