Wing ribs

Posted on December 23, 2007August 5, 2008 by Glenn

Make first rear rib, work on joggle method.

1.7 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Wing ribs

  • Glenn
  • January 5, 2008
  • 0

RR #5. 1.2 hours.

  • Wing

De-burring

  • Glenn
  • September 21, 2008
  • 0

De-burr Nose Rib Angles and Hat Stiffeners, various other parts. 2.75 Hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.