Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 27, 2008August 3, 2008 by Glenn

Continue forming nose ribs. Also spent some time adding stiffening gusset to brake.

5.07 hours.

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose ribs

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 2, 2008
  • 0

Continued cutting 40 thou sheet including main spar webs. These took about 25 runs with an Olfa P-800 knife and were a bit tricky to […]

  • Wing

Crimp cutouts contd…

  • Glenn
  • October 30, 2007
  • 0

Complete cutouts in form blocks. 1.0 hour. Total for October 42.08 hours. Total time overall: 103.82 hrs

  • Wing

Spar Cap Angles

  • Glenn
  • April 13, 2009
  • 0

Continue cutting and bending. 3.75 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.