Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting sheet

Posted on March 1, 2008August 5, 2008 by Glenn

Began cutting 0.040 sheet.

6.63 hours.

Posted in Wing

Post navigation

Previous: Cutting wing skin, spar webs, etc.
Next: Cutting 0.040 Sheet

Related Posts

  • Wing

6-W-3 9 Nose Rib Angles

  • Glenn
  • September 20, 2008
  • 0

Cut and folded nose rib angles.

  • Wing

Wing ribs truing

  • Glenn
  • January 25, 2008
  • 0

Completed truing up the flanges on the rear ribs and adjusting any bows in them. 1.5 hours.

  • Wing

Aileron Skins

  • Glenn
  • June 7, 2008
  • 0

Spent quite a bit of time getting the bend profile right using a scrap strip for practice. Then went on and made the aileron ribs. […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.