Skip to content
Tuesday, April 21, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting sheet

Posted on March 1, 2008August 5, 2008 by Glenn

Began cutting 0.040 sheet.

6.63 hours.

Posted in Wing

Post navigation

Previous: Cutting wing skin, spar webs, etc.
Next: Cutting 0.040 Sheet

Related Posts

  • Wing

Spar Cap Angles

  • Glenn
  • April 12, 2009
  • 0

Drag out new sheet of 0.032, begin cutting for Spar Cap Angles. 3.67 Hours.

  • Wing

Spar Caps

  • Glenn
  • June 7, 2009
  • 0

Complete pre-drilling spar caps. Pre-drill end of spars for tips, trim doublers and caps. 2.93 hours.

  • Wing

Cutting block upper halves

  • Glenn
  • October 21, 2007
  • 0

Make other halves of cutting blocks. 5.15 hours

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.