Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Lightening holes

Posted on February 9, 2008August 5, 2008 by Glenn

Continue with lightening holes.

3.30 Hours

Posted in Wing

Post navigation

Previous: Lightening holes
Next: Lightening holes

Related Posts

  • Wing

Nose rib form blocks

  • Glenn
  • November 3, 2007
  • 0

Filed crimp recesses in nose rib form blocks. 4.80 hours.

  • Wing

Flap Ribs

  • Glenn
  • June 15, 2008
  • 0

Completed fabricating flap ribs. Spent the afternoon going over what parts to buy from factory due to difficulty in fabricating. These mostly consisted of 40 […]

  • Wing

Aileron Skins

  • Glenn
  • June 22, 2008
  • 0

Bent second aileron skin, cut tips to shape, de-burr etc. 5.78 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.