Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on June 20, 2009March 7, 2010 by Glenn

Flange Nose Rib lightening holes.

2.55 hours.

Posted in Wing

Post navigation

Previous: Spar Cap Angles
Next: Aileron Bellcranks

Related Posts

  • Wing

Spar Cap Angles

  • Glenn
  • April 13, 2009
  • 0

Continue cutting and bending. 3.75 Hours.

  • Wing

Nose Ribs

  • Glenn
  • April 26, 2008
  • 0

Continue forming Nose Ribs 6-W-5 2. 2.12 hours.

  • Wing

Cutting and form blocks

  • Glenn
  • October 7, 2007
  • 0

Finished form blocks, started on cutting blocks. 4.50 hours

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.