Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on June 20, 2009March 7, 2010 by Glenn

Flange Nose Rib lightening holes.

2.55 hours.

Posted in Wing

Post navigation

Previous: Spar Cap Angles
Next: Aileron Bellcranks

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 18, 2007
  • 0

Get blanks ready for trimming. 2.47 hours.

  • Wing

Wing Spars February 2010

  • Glenn
  • February 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/02/2010 Spar Upgrade Root Doublers 6-ZU-1 2 11:45 13:00 1:15 1.25 14:15 15:43 1:28 1.47 16:15 […]

  • Wing

Tanks, Spar Upgrades January 2010

  • Glenn
  • January 31, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/01/2010 Riveting practice 11:00 11:30 0:30 0.50 Set out Fuel Tank ends 11:30 13:08 1:38 1.63 […]

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.