Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Cap Angles

Posted on June 20, 2009March 7, 2010 by Glenn

Pilot drill replacement angles to Spar Webs.

0.75 hours.

Posted in Wing

Post navigation

Previous: Spar Cap Angles
Next: Nose Ribs

Related Posts

  • Wing

Nose ribs

  • Glenn
  • May 3, 2008
  • 0

Finish forming last two nose ribs, cut lightening holes. 4.97 hours.

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 17, 2008
  • 0

Continue cutting 40 thou sheet. 2.03 hours

  • Wing

Bottom Spar Cap Angles

  • Glenn
  • April 19, 2009
  • 0

Completed Bottom Spar Cap Angles

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.