Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Doublers, Centre Spar Caps

Posted on May 9, 2009September 23, 2009 by Glenn

Mark and cut Spar Cap Doublers and Centre Spar Caps.

1.18 Hours.

Posted in Wing

Post navigation

Previous: Spar Caps
Next: Centre Spar Caps & Doublers

Related Posts

  • Wing

Lightening holes

  • Glenn
  • February 10, 2008
  • 0

Continue with lightening holes. Once complete, bring in next sheet of 0.025 and start cutting. 5.15 Hours.

  • Wing

Bevelling form blocks contd…

  • Glenn
  • October 14, 2007
  • 0

Bevelling form blocks, mark position of flutes. Continue with cutting blocks. 6.52 hours

  • Wing

Alieron Bellcranks

  • Glenn
  • June 27, 2009
  • 0

Went flying with Tony this morning in his RV. Afternoon spent making second Aileron Bellcrank. 2 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.