Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Doublers, Centre Spar Caps

Posted on May 9, 2009September 23, 2009 by Glenn

Mark and cut Spar Cap Doublers and Centre Spar Caps.

1.18 Hours.

Posted in Wing

Post navigation

Previous: Spar Caps
Next: Centre Spar Caps & Doublers

Related Posts

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Wing

Aileron Bellcranks

  • Glenn
  • June 21, 2009
  • 0

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.

  • Wing

Nose Ribs

  • Glenn
  • April 12, 2008
  • 0

Begin cutting new sheet of 0.025 for nose ribs. 2.58 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.