Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Bevelling form blocks contd…

Posted on October 14, 2007August 5, 2008 by Glenn

Bevelling form blocks, mark position of flutes. Continue with cutting blocks.

6.52 hours

Posted in Wing

Post navigation

Previous: Cutting blocks, bevelling form blocks
Next: Cutting block upper halves

Related Posts

  • Wing

Rear Ribs

  • Glenn
  • April 20, 2008
  • 0

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides. 5.27 hours.

  • Wing

Spar Webs

  • Glenn
  • April 26, 2009
  • 0

Pilot drill Main Spar Webs. 4.13 Hours.

  • Wing

Spar Caps

  • Glenn
  • June 6, 2009
  • 0

Spar cap fitting and pre-drilling. 4.83 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.