Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Bevelling form blocks contd…

Posted on October 14, 2007August 5, 2008 by Glenn

Bevelling form blocks, mark position of flutes. Continue with cutting blocks.

6.52 hours

Posted in Wing

Post navigation

Previous: Cutting blocks, bevelling form blocks
Next: Cutting block upper halves

Related Posts

  • Wing

Wing Ribs

  • Glenn
  • March 7, 2009
  • 0

Finished the day de-burring wing ribs in preparation for flanging. 0.9 Hours.

  • Wing

Wing November 2009

  • Glenn
  • November 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 7/11/2009 De-burr wing spars, set out rib angles and hat stiffeners, make cutouts in inner 16:00 […]

  • Wing

Bottom Spar Cap Angles

  • Glenn
  • April 19, 2009
  • 0

Completed Bottom Spar Cap Angles

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.