Nose Ribs Posted on April 27, 2008August 3, 2008 by Glenn Continue forming nose ribs. Also spent some time adding stiffening gusset to brake. 5.07 hours.
Wing Spars, fuel tank skins. Glenn April 25, 2009 0 Re-check Spar Web markings, de-burr edges prior to drilling. Cut Fuel Tank Skins to size. 4.33 Hours.
Wing Flanging Wing Ribs Glenn April 10, 2009 0 Trialled flanging ribs by lowering car from jack onto rib positioned in dies. Works okay. 2.00 Hours.
Wing Nose Ribs Glenn April 25, 2008 0 De-burr nose rib blanks, formed first two nose ribs. 2.90 hours.