Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 26, 2008August 3, 2008 by Glenn

Continue forming Nose Ribs 6-W-5 2.

2.12 hours.

Forming Nose Ribs

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose Ribs

Related Posts

  • Wing

Wing Ribs

  • Glenn
  • May 24, 2009
  • 0

Flange lightening holes. The drop-the-car-on-the-jack method worked very well, however I found the ribs had a slight cupping in from top to bottom. Putting them […]

  • Wing

Wing ribs

  • Glenn
  • January 13, 2008
  • 0

RR #3 contd., RR #3 opposite, RR #2, RR#2 opposite, RR #1, RR #1 opposite. All ribs formed, ready for joggle finishing and trueing. 3.57 […]

  • Wing

Lightening holes

  • Glenn
  • February 10, 2008
  • 0

Continue with lightening holes. Once complete, bring in next sheet of 0.025 and start cutting. 5.15 Hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.