Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 26, 2008August 3, 2008 by Glenn

Continue forming Nose Ribs 6-W-5 2.

2.12 hours.

Forming Nose Ribs

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose Ribs

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 2, 2008
  • 0

Continued cutting 40 thou sheet including main spar webs. These took about 25 runs with an Olfa P-800 knife and were a bit tricky to […]

  • Wing

De-burring

  • Glenn
  • September 21, 2008
  • 0

De-burr Nose Rib Angles and Hat Stiffeners, various other parts. 2.75 Hours.

  • Wing

Wing ribs truing

  • Glenn
  • January 24, 2008
  • 0

Took out the bows in the rear ribs using fluting pliers, then adjusted the flange angles by placing the rib on the bench and simply […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.