Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 26, 2008August 3, 2008 by Glenn

Continue forming Nose Ribs 6-W-5 2.

2.12 hours.

Forming Nose Ribs

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Nose Ribs

Related Posts

  • Wing

Wing Spars February 2010

  • Glenn
  • February 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/02/2010 Spar Upgrade Root Doublers 6-ZU-1 2 11:45 13:00 1:15 1.25 14:15 15:43 1:28 1.47 16:15 […]

  • Wing

6-W-3 9 Nose Rib Angles

  • Glenn
  • September 20, 2008
  • 0

Cut and folded nose rib angles.

  • Wing

Nose Ribs

  • Glenn
  • April 27, 2008
  • 0

Continue forming nose ribs. Also spent some time adding stiffening gusset to brake. 5.07 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.