Skip to content
Tuesday, April 21, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-W-3 9 Nose Rib Angles

Posted on September 20, 2008September 20, 2008 by Glenn

Cut and folded nose rib angles.

3.83 Hours

Posted in Wing

Post navigation

Previous: 6-W-4 1 & 2 Centre Spar Webs
Next: De-burring

Related Posts

  • Wing

Spar Cap Angles

  • Glenn
  • April 12, 2009
  • 0

Drag out new sheet of 0.032, begin cutting for Spar Cap Angles. 3.67 Hours.

  • Wing

Wing Spars

  • Glenn
  • August 31, 2008
  • 0

Set out wing spar webs. Also spent some time divising methods of forming Hat Stiffeners. 6.17 Hours.

  • Wing

Bevelling form blocks contd…

  • Glenn
  • October 14, 2007
  • 0

Bevelling form blocks, mark position of flutes. Continue with cutting blocks. 6.52 hours

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.