Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Aileron Skins

Posted on June 22, 2008July 22, 2008 by Glenn

Bent second aileron skin, cut tips to shape, de-burr etc.

5.78 Hours.

Posted in Wing

Post navigation

Previous: Aileron Skins
Next: Flanging Dies

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 22, 2007
  • 0

Trim blanks. 6.05 hours.

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 15, 2008
  • 0

More 40 thou sheet cutting. 2.23 hours.

  • Wing

Wing Spars March 2010

  • Glenn
  • March 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/03/2010 Continue with spars- after doing somemore setting up, I took some photos and emailed them […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.