Skip to content
Tuesday, April 21, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 25, 2008August 3, 2008 by Glenn

De-burr nose rib blanks, formed first two nose ribs.

2.90 hours.

Posted in Wing

Post navigation

Previous: Rear Ribs
Next: Nose Ribs

Related Posts

  • Wing

Rear Ribs

  • Glenn
  • April 19, 2008
  • 0

Form other RR#8, RR#9. 0.98 hours.

  • Wing

Wing ribs

  • Glenn
  • January 20, 2008
  • 0

Tidy up joggles. Spent quite a lot of today researching issues surrounding joggles, etc. I was a bit concerned the rounds on the joggles were […]

  • Wing

Cutting block upper halves

  • Glenn
  • October 21, 2007
  • 0

Make other halves of cutting blocks. 5.15 hours

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.