Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 25, 2008August 3, 2008 by Glenn

De-burr nose rib blanks, formed first two nose ribs.

2.90 hours.

Posted in Wing

Post navigation

Previous: Rear Ribs
Next: Nose Ribs

Related Posts

  • Wing

Wing Spars February 2010

  • Glenn
  • February 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/02/2010 Spar Upgrade Root Doublers 6-ZU-1 2 11:45 13:00 1:15 1.25 14:15 15:43 1:28 1.47 16:15 […]

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 2, 2008
  • 0

Continued cutting 40 thou sheet including main spar webs. These took about 25 runs with an Olfa P-800 knife and were a bit tricky to […]

  • Wing

Spar Cap Angles

  • Glenn
  • April 18, 2009
  • 0

Spar Cap Angles – start second angle

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.