Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose Ribs

Posted on April 25, 2008August 3, 2008 by Glenn

De-burr nose rib blanks, formed first two nose ribs.

2.90 hours.

Posted in Wing

Post navigation

Previous: Rear Ribs
Next: Nose Ribs

Related Posts

  • Wing

Wing September 2009

  • Glenn
  • September 27, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 12/09/2009 Make timber brackets for spar assembly 15:00 18:00 3:00 3.00 13/09/2009 Drill out spar pilot […]

  • Wing

Nose Ribs

  • Glenn
  • April 26, 2008
  • 0

Continue forming Nose Ribs 6-W-5 2. 2.12 hours.

  • Wing

Centre Spar Doublers & Caps

  • Glenn
  • May 16, 2009
  • 0

Spot drill, then pilot drill Centre Spar Doublers & Caps. 4.22 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.