Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Elevator ribs

Posted on December 10, 2007July 22, 2008 by Glenn

Finish cutting elevator ribs, de-burr, drill relief holes, bend first one.

1.83 hours.

Posted in Empennage

Post navigation

Previous: Marking off
Next: Elevator ribs

Related Posts

  • Empennage

Priming Rudder Parts

  • Glenn
  • September 14, 2008
  • 0

The temperature has finally got above 15 degrees

  • Empennage
  • Horizontal Stabiliser

Stabiliser Assembly

  • Glenn
  • March 28, 2008
  • 0

Preparing the Stabiliser Skeleton Some of these components were 0.040 and 0.063 and I ordered them from Zenith, given the problems I’d had bending anything […]

  • Empennage

Rudder Skins

  • Glenn
  • August 23, 2008
  • 0

Trim rudder skin, align, pilot drill and cleco to skeleton. I spent quite a lot of time getting the alignment right and ensuring there was […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.