Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Lightening holes

Posted on February 10, 2008August 5, 2008 by Glenn

Continue with lightening holes. Once complete, bring in next sheet of 0.025 and start cutting.

5.15 Hours.

Posted in Wing

Post navigation

Previous: Lightening holes
Next: Rudder Spar

Related Posts

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

De-burr wing rib blanks. 1.37 hours.

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 17, 2008
  • 0

Continue cutting 40 thou sheet. 2.03 hours

  • Wing

Spar Cap Angles

  • Glenn
  • June 14, 2009
  • 0

Continued with making new Upper Spar Cap Angles. The new versions are straighter and the old ones had some holes that were elongated. 3.7 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.