Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Lightening holes

Posted on February 9, 2008August 5, 2008 by Glenn

Continue with lightening holes.

3.30 Hours

Posted in Wing

Post navigation

Previous: Lightening holes
Next: Lightening holes

Related Posts

  • Wing

Cutting 0.040 Sheet

  • Glenn
  • March 15, 2008
  • 0

More 40 thou sheet cutting. 2.23 hours.

  • Wing

Rear Channels

  • Glenn
  • April 11, 2009
  • 0

Completed adjusting and truing channels by hand. 2.58 Hours.

  • Wing

Main Spars

  • Glenn
  • May 23, 2009
  • 0

Bend Spar Web ends, drill lightening holes, trim angles on ends. 2.02 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.