Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Lightening holes

Posted on February 9, 2008August 5, 2008 by Glenn

Continue with lightening holes.

3.30 Hours

Posted in Wing

Post navigation

Previous: Lightening holes
Next: Lightening holes

Related Posts

  • Wing

Wing ribs

  • Glenn
  • January 13, 2008
  • 0

RR #3 contd., RR #3 opposite, RR #2, RR#2 opposite, RR #1, RR #1 opposite. All ribs formed, ready for joggle finishing and trueing. 3.57 […]

  • Wing

Spars, fuel tank skins.

  • Glenn
  • April 25, 2009
  • 0

Re-check Spar Web markings, de-burr edges prior to drilling. Cut Fuel Tank Skins to size. 4.33 Hours.

  • Wing

Wing ribs

  • Glenn
  • December 26, 2007
  • 0

Continue with rear ribs. 3.97 hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.