Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 5, 2008August 5, 2008 by Glenn

RR #5.

1.2 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

6-W-LO1 2 Locker Rear Panel

  • Glenn
  • December 6, 2008
  • 0

6-W-LO1 2 Locker Rear Panel

  • Wing

Wing Spars February 2010

  • Glenn
  • February 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/02/2010 Spar Upgrade Root Doublers 6-ZU-1 2 11:45 13:00 1:15 1.25 14:15 15:43 1:28 1.47 16:15 […]

  • Wing

Spar Cap Angles

  • Glenn
  • April 18, 2009
  • 0

Spar Cap Angles – start second angle

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.