Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 12, 2008August 5, 2008 by Glenn

RR #4, RR #4 opposite, RR#3.

4.78 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Spar Cap Angles

  • Glenn
  • April 12, 2009
  • 0

Drag out new sheet of 0.032, begin cutting for Spar Cap Angles. 3.67 Hours.

  • Wing

Lightening holes

  • Glenn
  • February 9, 2008
  • 0

Continue with lightening holes. 3.30 Hours

  • Wing

Alieron Bellcranks

  • Glenn
  • June 27, 2009
  • 0

Went flying with Tony this morning in his RV. Afternoon spent making second Aileron Bellcrank. 2 hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.