Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Elevator

Posted on July 19, 2009March 7, 2010 by Glenn

Cut out Elevator Skin.

4 hours.

Posted in Empennage

Post navigation

Previous: Lower Bearing Support
Next: Elevator

Related Posts

  • Empennage

Rudder Spar

  • Glenn
  • February 13, 2008
  • 0

Cut and bend vertical tail spar. Rudder RR#1. 1.58 Hours.

  • Empennage

Rudder Tip Rib

  • Glenn
  • January 28, 2008
  • 0

After three more attempts and experiments I finally arrived at one I was happy with. One of the problems I had was the plans are […]

  • Empennage

Rudder Tip Rib

  • Glenn
  • January 27, 2008
  • 0

Began forming rudder tip rib. Fully expected this would require several attempts! 3.57 hours

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.