Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Webs

Posted on April 26, 2009September 23, 2009 by Glenn

Pilot drill Main Spar Webs.

4.13 Hours.

Posted in Wing

Post navigation

Previous: Spars, fuel tank skins.
Next: Spar Caps & Angles

Related Posts

  • Wing

Ailerons

  • Glenn
  • January 4, 2009
  • 0

Ailerons-

  • Wing

6-W-4 1 & 2 Centre Spar Webs

  • Glenn
  • September 14, 2008
  • 0

Dragged out a new sheet of 0.032

  • Wing

Wingtip Top Angles

  • Glenn
  • December 13, 2008
  • 0

Bend and trim to size 6-W-9 7 Wingtip Top Angles

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.