Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Webs

Posted on April 26, 2009September 23, 2009 by Glenn

Pilot drill Main Spar Webs.

4.13 Hours.

Posted in Wing

Post navigation

Previous: Spars, fuel tank skins.
Next: Spar Caps & Angles

Related Posts

  • Wing

6-W-4 1 & 2 Centre Spar Webs

  • Glenn
  • September 14, 2008
  • 0

Dragged out a new sheet of 0.032

  • Wing

Aileron Bellcranks

  • Glenn
  • June 21, 2009
  • 0

Made 6-W-6 10 Bellcrank Support Channels and first Aileron Bellcrank 6-W-10 1. 3.1 hours.

  • Wing

Rear Channels

  • Glenn
  • April 10, 2009
  • 0

Continued shaping and truing channels. 3.17 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.