Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 10, 2009September 23, 2009 by Glenn

Continued shaping and truing channels.

3.17 Hours.

Posted in Wing

Post navigation

Previous: Flanging Wing Ribs
Next: Rear Channels

Related Posts

  • Wing

Rear Channels

  • Glenn
  • April 11, 2009
  • 0

Completed adjusting and truing channels by hand. 2.58 Hours.

  • Wing

Wing ribs

  • Glenn
  • December 22, 2007
  • 0

Trim blanks. 6.05 hours.

  • Wing

Nose Ribs

  • Glenn
  • April 27, 2008
  • 0

Continue forming nose ribs. Also spent some time adding stiffening gusset to brake. 5.07 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.