Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 10, 2009September 23, 2009 by Glenn

Continued shaping and truing channels.

3.17 Hours.

Posted in Wing

Post navigation

Previous: Flanging Wing Ribs
Next: Rear Channels

Related Posts

  • Wing

Wing ribs

  • Glenn
  • January 13, 2008
  • 0

RR #3 contd., RR #3 opposite, RR #2, RR#2 opposite, RR #1, RR #1 opposite. All ribs formed, ready for joggle finishing and trueing. 3.57 […]

  • Wing

Spar Cap Angles

  • Glenn
  • June 13, 2009
  • 0

I wasn’t totally happy with the Upper Spar Cap Angles 6-W-3 6, so I went ahead and made new ones. 4 hours.

  • Wing

Wing Spar Hat Stiffeners

  • Glenn
  • September 6, 2008
  • 0

The hat stiffeners for the spar webs proved to be quite a task

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.