Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skeleton

Posted on December 27, 2008December 28, 2008 by Glenn

Re-assemble primed rudder skeleton, begin riveting.

0.75 Hours.

Posted in Empennage

Post navigation

Previous: Wingtip Top Angles
Next: Rudder Skeleton

Related Posts

  • Empennage

Elevator

  • Glenn
  • July 19, 2009
  • 0

Cut out Elevator Skin. 4 hours.

  • Empennage

Rudder Tip Rib

  • Glenn
  • September 15, 2007
  • 0

I thought I would do some trial forming of the rudder tip rib in a piece of 2024 sheet scrap. This gave me some good […]

  • Empennage
  • Horizontal Stabiliser

Stabiliser Spar

  • Glenn
  • March 21, 2008
  • 0

Having cut the stabiliser spar blanks from sheet, I attempted folding them on the home made brake. I spent a few hours trying to rectify […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.