Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 10, 2009September 23, 2009 by Glenn

Continued shaping and truing channels.

3.17 Hours.

Posted in Wing

Post navigation

Previous: Flanging Wing Ribs
Next: Rear Channels

Related Posts

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Wing ribs

  • Glenn
  • December 23, 2007
  • 0

Make first rear rib, work on joggle method. 1.7 hours.

  • Wing

Wing ribs truing

  • Glenn
  • January 25, 2008
  • 0

Completed truing up the flanges on the rear ribs and adjusting any bows in them. 1.5 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.