Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Fuselage Form Blocks

Posted on February 17, 2009February 21, 2009 by Glenn

Instrument Panel & Middle Bulkhead form blocks marked out.

1.58 Hours.

Posted in Fuselage

Post navigation

Previous: Baggage Bulkhead Form Block
Next: Rudder Assembly

Related Posts

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Fuselage

Lower Bearing Support

  • Glenn
  • July 5, 2009
  • 0

6-B-8 9 Lower Bearing Support. 1.8 hours.

  • Fuselage

6-B-5 Gear Channel

  • Glenn
  • September 21, 2008
  • 0

Cut and bend 6-B-5 Gear Channel.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.