Fuselage Form Blocks

Posted on February 9, 2009February 21, 2009 by Glenn

Rough cut MDF sheet for bulkhead form blocks.

0.51 Hours.

Posted in Fuselage

Post navigation

Previous: Ailerons
Next: Fuselage Bulkhead Form Blocks

Related Posts

  • Fuselage

Baggage Bulkhead Form Block

  • Glenn
  • February 16, 2009
  • 0

Mark out Baggage Back Bulkhead form block. 0.95 Hours.

  • Fuselage

Lower Bearing Support

  • Glenn
  • July 5, 2009
  • 0

6-B-8 9 Lower Bearing Support. 1.8 hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.