Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 5, 2008August 5, 2008 by Glenn

RR #5.

1.2 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Rear Ribs

  • Glenn
  • April 20, 2008
  • 0

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides. 5.27 hours.

  • Fuselage
  • Wing

Tie Down Rings, Torque Tube Bearing

  • Glenn
  • June 28, 2009
  • 0

Cleaned up Aileron Bellcranks. Went ahead and made 6-W-9-1 Tiedown Rings, 6-B-17 Rear Torque Tube Bearing. 4.63 hours.

  • Wing

Ailerons

  • Glenn
  • January 4, 2009
  • 0

Ailerons-

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.