Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 2, 2008August 5, 2008 by Glenn

RR#6, Opposite RR#6.

1.82 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

6-W-7 3 Hinge Doubler

  • Glenn
  • November 9, 2008
  • 0

6-W-7 3 Hinge Doubler. .85 Hours.

  • Wing

Centre Spar Doublers & Caps

  • Glenn
  • May 16, 2009
  • 0

Spot drill, then pilot drill Centre Spar Doublers & Caps. 4.22 Hours.

  • Wing

Wing August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/08/2009 Flaps 14:00 16:17 2:17 2.28 16:45 17:50 1:05 1.08 29/08/2009 Flap skin 11:00 13:05 2:05 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.