Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Wing ribs

Posted on January 2, 2008August 5, 2008 by Glenn

RR#6, Opposite RR#6.

1.82 hours.

Posted in Wing

Post navigation

Previous: Wing ribs
Next: Wing ribs

Related Posts

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Spars, fuel tank skins.

  • Glenn
  • April 25, 2009
  • 0

Re-check Spar Web markings, de-burr edges prior to drilling. Cut Fuel Tank Skins to size. 4.33 Hours.

  • Wing

Wing Ribs

  • Glenn
  • May 24, 2009
  • 0

Flange lightening holes. The drop-the-car-on-the-jack method worked very well, however I found the ribs had a slight cupping in from top to bottom. Putting them […]