Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Elevator

Posted on July 26, 2009March 7, 2010 by Glenn

Elevator construction.

5.92 hours.

Posted in Empennage

Post navigation

Previous: Elevator
Next: Elevator August 2009

Related Posts

  • Empennage

Rudder Nose Skin (Rebuilt)

  • Glenn
  • June 7, 2008
  • 0

ZAC responded to my enquiries and advised my skin fit was fine, however, I noticed during the week a smiley on one face. Only small, […]

  • Empennage

Elevator ribs

  • Glenn
  • December 10, 2007
  • 0

Finish cutting elevator ribs, de-burr, drill relief holes, bend first one. 1.83 hours.

  • Empennage

Rudder Skeleton

  • Glenn
  • March 24, 2008
  • 0

Re-make nose rib again- not 100% happy with last one. Continue with rudder build- drill and cleco ribs to spar. 7.33 hours.