Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Lower Bearing Support

Posted on July 5, 2009March 7, 2010 by Glenn

6-B-8 9 Lower Bearing Support.

1.8 hours.

Posted in Fuselage

Post navigation

Previous: Tie Down Rings, Torque Tube Bearing
Next: Elevator

Related Posts

  • Fuselage

Firewall Stiffeners

  • Glenn
  • March 30, 2008
  • 0

Cut and fabricate 40 thou Firewall Stiffeners, cut lightening holes. Excellent results bending with extra left on flanges then trimmed later. 5.53 hours. Total for […]

  • Fuselage

Baggage Bulkhead Form Block

  • Glenn
  • February 16, 2009
  • 0

Mark out Baggage Back Bulkhead form block. 0.95 Hours.

  • Fuselage
  • Tools

Fuselage, Tools January 2010

  • Glenn
  • January 17, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 1/01/2010 Modify brake handle – move braces out from centre 11:00 12:50 1:50 1.83 Bend second […]