Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Caps

Posted on June 6, 2009March 7, 2010 by Glenn

Spar cap fitting and pre-drilling.

4.83 hours.

Posted in Wing

Post navigation

Previous: Wing Ribs
Next: Spar Caps

Related Posts

  • Wing

Rear Ribs

  • Glenn
  • April 20, 2008
  • 0

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides. 5.27 hours.

  • Wing

Wing ribs

  • Glenn
  • January 2, 2008
  • 0

RR#6, Opposite RR#6. 1.82 hours.

  • Wing

Centre Spar Caps

  • Glenn
  • May 17, 2009
  • 0

Fit caps to Centre Spar Webs. 1.27 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.