Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Caps

Posted on June 6, 2009March 7, 2010 by Glenn

Spar cap fitting and pre-drilling.

4.83 hours.

Posted in Wing

Post navigation

Previous: Wing Ribs
Next: Spar Caps

Related Posts

  • Wing

Flap Ribs

  • Glenn
  • June 14, 2008
  • 0

Cut out blanks and began bending flap ribs. 2.83 Hours.

  • Wing

Spar Caps & Angles

  • Glenn
  • May 2, 2009
  • 0

Finish straightening Spar Cap Angles, mark off and cut Spar Caps to finished lengths. 2.63 Hours.

  • Wing

Nose Ribs, Rear Ribs

  • Glenn
  • April 13, 2008
  • 0

Continue cutting sheet, re-make one RR#8 to replace one with too large rear lightening hole. 5.88 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.