Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Spar Caps

Posted on June 6, 2009March 7, 2010 by Glenn

Spar cap fitting and pre-drilling.

4.83 hours.

Posted in Wing

Post navigation

Previous: Wing Ribs
Next: Spar Caps

Related Posts

  • Wing

Rear Channels

  • Glenn
  • April 5, 2009
  • 0

More rear channel bending… 6.28 Hours.

  • Wing

Bevelling form blocks contd…

  • Glenn
  • October 14, 2007
  • 0

Bevelling form blocks, mark position of flutes. Continue with cutting blocks. 6.52 hours

  • Wing

Rear Ribs

  • Glenn
  • April 20, 2008
  • 0

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides. 5.27 hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.