Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Elevator ribs

Posted on December 15, 2007July 23, 2025 by Glenn

Completed elevator ribs.

2.17 hours.

Posted in Empennage

Post navigation

Previous: Elevator ribs
Next: Rudder

Related Posts

  • Empennage
  • Horizontal Stabiliser

Stabiliser Form Blocks

  • Glenn
  • August 5, 2007
  • 0

I started making the form blocks for the stabiliser along with all of the wing form blocks. I used 18mm MDF, rough cutting them with […]

  • Empennage

Rudder Skin

  • Glenn
  • May 11, 2008
  • 0

Cut skin oversize, however bottom edge dimension is a tad under full skin width bent okay, but bends slightly uneven. Will make another- no problem […]

  • Empennage

Rudder

  • Glenn
  • August 30, 2008
  • 0

Dismantle rudder assembly, de-burr and scour prior to priming. 5.5 Hours.