Skip to content
Friday, November 20, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rudder Skeleton

Posted on March 23, 2008July 22, 2008 by Glenn

Continue with rudder build- drill and cleco doublers to spar.

3.83 hours.

Posted in Empennage

Post navigation

Previous: 6-T-4 5 Rudder Spar Doublers
Next: Rudder Skeleton

Related Posts

  • Empennage

Priming Rudder Parts

  • Glenn
  • September 14, 2008
  • 0

The temperature has finally got above 15 degrees

  • Empennage

Rudder Skins

  • Glenn
  • May 31, 2008
  • 0

Form nose skin, begin laying out rear skin for fitting. 5.75 Hours.

  • Empennage

Tip rib test #2

  • Glenn
  • September 16, 2007
  • 0

Do second test of rudder tip rib with new form block. 7.6 hrs

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.