Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Channels

Posted on April 10, 2009September 23, 2009 by Glenn

Continued shaping and truing channels.

3.17 Hours.

Posted in Wing

Post navigation

Previous: Flanging Wing Ribs
Next: Rear Channels

Related Posts

  • Wing

Rear Ribs

  • Glenn
  • April 20, 2008
  • 0

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides. 5.27 hours.

  • Wing

Ailerons

  • Glenn
  • February 22, 2009
  • 0

Continue pre-drilling starboard aileron. 3.65 Hours.

  • Wing

Wing August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/08/2009 Flaps 14:00 16:17 2:17 2.28 16:45 17:50 1:05 1.08 29/08/2009 Flap skin 11:00 13:05 2:05 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.