Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Marking off

Posted on December 9, 2007July 22, 2008 by Glenn

Mark off rest of sheet and cut.

2.58 hours.

Posted in Empennage

Post navigation

Previous: Stabiliser Ribs
Next: Elevator ribs

Related Posts

  • Empennage

Rudder Skeleton

  • Glenn
  • December 28, 2008
  • 0

Continue riveting

  • Empennage

Tip rib test #2

  • Glenn
  • September 16, 2007
  • 0

Do second test of rudder tip rib with new form block. 7.6 hrs

  • Empennage

Rudder Skins

  • Glenn
  • August 23, 2008
  • 0

Trim rudder skin, align, pilot drill and cleco to skeleton. I spent quite a lot of time getting the alignment right and ensuring there was […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.