Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-B-8 1 Gear Gussets

Posted on December 6, 2008December 8, 2008 by Glenn

Marked out gear gussets from 40 thou stock.

0.5 Hours.

Posted in Fuselage