Skip to content
Monday, February 23, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-B-8 1 Gear Gussets

Posted on December 6, 2008December 8, 2008 by Glenn

Marked out gear gussets from 40 thou stock.

0.5 Hours.

Posted in Fuselage

Post navigation

Previous: 6-B-10 1 Cabin Floor
Next: 6-W-LO1 2 Locker Rear Panel

Related Posts

  • Fuselage

Fuselage Form Blocks

  • Glenn
  • March 14, 2009
  • 0

I noticed a small error on the fuselage form blocks

  • Fuselage

Fuselage form blocks

  • Glenn
  • March 1, 2009
  • 0

Trimmed and rounded fuselage form blocks. 3.08 Hours.

  • Fuselage

Fuselage Bulkhead Form Blocks

  • Glenn
  • February 9, 2009
  • 0

Rough cut MDF sheet for bulkhead form blocks. 0.85 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.