Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

6-B-8 1 Gear Gussets

Posted on December 6, 2008December 8, 2008 by Glenn

Marked out gear gussets from 40 thou stock.

0.5 Hours.

Posted in Fuselage

Post navigation

Previous: 6-B-10 1 Cabin Floor
Next: 6-W-LO1 2 Locker Rear Panel

Related Posts

  • Fuselage

Fuselage Parts

  • Glenn
  • November 1, 2008
  • 0

Form 6-B-5 6 Upright Channels, 6-3-T 2 Elevator Centre Channel. Begin cutting new 0.025 sheet. 5.37 Hours.

  • Fuselage

Fuselage Parts

  • Glenn
  • October 5, 2008
  • 0

Continued cutting 0.032 parts for fuselage. 1.67 Hours.

  • Fuselage

Fuselage Form Blocks

  • Glenn
  • February 17, 2009
  • 0

Instrument Panel & Middle Bulkhead form blocks marked out. 1.58 Hours.

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.