Skip to content
Saturday, August 22, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose ribs

Posted on May 3, 2008August 3, 2008 by Glenn

Finish forming last two nose ribs, cut lightening holes.

4.97 hours.

Nose Ribs

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Rudder Skin

Related Posts

  • Wing

Ailerons

  • Glenn
  • January 10, 2009
  • 0

Continued with aileron drilling

  • Wing

Spar Cap Angles

  • Glenn
  • April 13, 2009
  • 0

Continue cutting and bending. 3.75 Hours.

  • Wing

Aileron Ribs & Tip Ribs

  • Glenn
  • June 8, 2008
  • 0

Finished the aileron ribs and made the tip ribs. I have to say, the plans can be annoying at times, as here they make no […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.