Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Nose ribs

Posted on May 3, 2008August 3, 2008 by Glenn

Finish forming last two nose ribs, cut lightening holes.

4.97 hours.

Nose Ribs

Posted in Wing

Post navigation

Previous: Nose Ribs
Next: Rudder Skin

Related Posts

  • Wing

Spar Tips

  • Glenn
  • November 2, 2008
  • 0

Fabricate Spar Tips. 3.52 Hours.

  • Wing

Wing Spars March 2010

  • Glenn
  • March 28, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 6/03/2010 Continue with spars- after doing somemore setting up, I took some photos and emailed them […]

  • Wing

Wing Ribs

  • Glenn
  • May 24, 2009
  • 0

Flange lightening holes. The drop-the-car-on-the-jack method worked very well, however I found the ribs had a slight cupping in from top to bottom. Putting them […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.