Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Rear Ribs

Posted on April 20, 2008August 14, 2008 by Glenn

Form opposite RR#9, cut lightening holes in RRs #8 & #9 both sides.
5.27 hours.

Rear Rib Forming

Posted in Wing

Post navigation

Previous: Rear Ribs
Next: Nose Ribs

Related Posts

  • Wing

Wing ribs truing

  • Glenn
  • January 25, 2008
  • 0

Completed truing up the flanges on the rear ribs and adjusting any bows in them. 1.5 hours.

  • Wing

Nose Ribs

  • Glenn
  • April 25, 2008
  • 0

De-burr nose rib blanks, formed first two nose ribs. 2.90 hours.

  • Wing

Tanks, Spar Upgrades January 2010

  • Glenn
  • January 31, 2010
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/01/2010 Riveting practice 11:00 11:30 0:30 0.50 Set out Fuel Tank ends 11:30 13:08 1:38 1.63 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.