Skip to content
Friday, August 15, 2025

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting sheet

Posted on March 1, 2008August 5, 2008 by Glenn

Began cutting 0.040 sheet.

6.63 hours.

Posted in Wing

Post navigation

Previous: Cutting wing skin, spar webs, etc.
Next: Cutting 0.040 Sheet

Related Posts

  • Wing

Nose Ribs, Rear Ribs

  • Glenn
  • April 13, 2008
  • 0

Continue cutting sheet, re-make one RR#8 to replace one with too large rear lightening hole. 5.88 hours.

  • Wing

Wing Form Blocks

  • Glenn
  • August 7, 2007
  • 0

I began plotting all the form blocks while waiting for my sheet to arrive. The first issue was the co-ordinates to plot the curves of […]

  • Wing

Wing ribs

  • Glenn
  • December 29, 2007
  • 0

Continue with rear ribs- RR#7, RR#6 – also modified fluting pliers. 3.35 hours. Total for December 57.60 hours. Total time overall: 193.97 hours.

Copyright © 2025 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.