Skip to content
Tuesday, April 21, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Cutting sheet

Posted on March 1, 2008August 5, 2008 by Glenn

Began cutting 0.040 sheet.

6.63 hours.

Posted in Wing

Post navigation

Previous: Cutting wing skin, spar webs, etc.
Next: Cutting 0.040 Sheet

Related Posts

  • Wing

Nose Ribs

  • Glenn
  • June 20, 2009
  • 0

Flange Nose Rib lightening holes. 2.55 hours.

  • Wing

Spar Caps & Angles

  • Glenn
  • May 2, 2009
  • 0

Finish straightening Spar Cap Angles, mark off and cut Spar Caps to finished lengths. 2.63 Hours.

  • Wing

Wing August 2009

  • Glenn
  • August 30, 2009
  • 0

Date Job Start Time Finish Time Total Time Decimal 23/08/2009 Flaps 14:00 16:17 2:17 2.28 16:45 17:50 1:05 1.08 29/08/2009 Flap skin 11:00 13:05 2:05 […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.