Tip rib test #2 Posted on September 16, 2007July 22, 2008 by Glenn Do second test of rudder tip rib with new form block. 7.6 hrs
Empennage Rudder Skeleton Glenn March 23, 2008 0 Continue with rudder build- drill and cleco doublers to spar. 3.83 hours.
Empennage Rudder Skeleton Glenn December 27, 2008 0 Re-assemble primed rudder skeleton, begin riveting. 0.75 Hours.
Empennage Rudder Tip Rib Glenn September 15, 2007 0 I thought I would do some trial forming of the rudder tip rib in a piece of 2024 sheet scrap. This gave me some good […]