Skip to content
Tuesday, October 6, 2026

Zenith 601 XL-B Build Log

Detailed construction log of Zenair Zodiac 601 XL Serial #6964

  • The Beginning
  • Wing
  • Empennage
    • Horizontal Stabiliser
    • Elevator
    • Rudder
  • Fuselage
  • Engine
  • Tools
  • Materials
  • Upgrade

Standard Z Angles

Posted on December 13, 2008August 28, 2024 by Glenn

Complete bending Z Angles Trim to final width & de-burr.

2.92 Hours.

Posted in Materials

Post navigation

Previous: Standard Z Angles 6-B-1 Z
Next: Wingtip Top Angles

Related Posts

  • Materials

Standard Angles

  • Glenn
  • November 22, 2008
  • 0

De-burr and bend Standard Angles

  • Materials

Standard Angles

  • Glenn
  • November 23, 2008
  • 0

Complete bending channels prior to cutting down

  • Materials

Metal arrives!

  • Glenn
  • November 22, 2007
  • 0

Today a pallet of 24 sheets of 6061-T6 arrived from Performance Metals in Sydney. This should be enough to make the entire aircraft’s sheet metal […]

Copyright © 2026 Zenith 601 XL-B Build Log Theme: Zenith By Glenn Andressen.